Engineering & Construction
Engineering Group SASE Transformation
Replaced legacy MPLS with SASE fabric, reducing CAD latency by 38% and standardising policies.
UAE & Saudi ArabiaNetwork & Infrastructure Security
Situation & challenges
- Shared CAD models suffering latency across remote sites.
- Inconsistent security posture between EU and GCC offices.
- Manual change management creating config drift.
Our solution
- SASE blueprint with dual POP architecture and local breakout.
- Automated policy orchestration integrated with HR systems.
- End-user digital experience monitoring for CAD workloads.
Outcomes
- Latency for CAD synchronisation down 38%.
- Policy enforcement aligned across EU and GCC in six weeks.
- Change execution time reduced by 55%.
38%
Latency reduction
6 weeks
Policy alignment
-55%
Change time
“We operate as one network now. Engineers notice responsiveness, leadership sees compliance.”
Want to achieve similar results?
Book a workshop to define scope, KPIs and a roadmap.